Producing Exo atmospheric Fiduciary Reference Measurements of Lunar Spectral Irradiance from the Airborne Lunar Spectral Irradiance (air LUSI) March 2022 Flight Campaign

Date

2023-06-12

Department

Program

Citation of Original Publication

Rights

This work was written as part of one of the author's official duties as an Employee of the United States Government and is therefore a work of the United States Government. In accordance with 17 U.S.C. 105, no copyright protection is available for such works under U.S. Law.
Public Domain Mark 1.0

Subjects

Abstract

In March of 2022 air-LUSI made four flights aboard a NASA ER-2 high-altitude aircraft and measured the lunar spectral irradiance from above ~95% of the Earth’s atmosphere. Measurements were made at lunar phases of -60.3°, -37.0°, -25.0° and -12.9° with a flight scheduled for -48.8° canceled due to high winds. The measurements are traceable to the SI through artifacts calibrated at NIST and used to calibrate air-LUSI while on the aircraft. An LED-based monitoring system then verifies the calibration during flight. In addition to calibration, both the transfer spectrograph and the air-LUSI instrument were characterized for their linearity and change in response with temperature. A tunable laser was used to measure their bandpass and correct for stray light. We will discuss the calibration approach and the measurement chain that establishes the SI-traceability of these measurements. A pipeline developed in Python incorporates the characterization results with measurements taken at each stage of the calibration chain to obtain a series of at-sensor lunar irradiances for each flight. To achieve top-of-the atmosphere (TOA) irradiance the flight telemetry data was used to correct for the residual atmospheric losses using MODTRAN. The spectra were normalized to a single time point using the ROLO model to correct for the relative change in lunar irradiance during forty minutes of data collection. The result is an SI-traceable TOA lunar spectrum for each flight. Our approach to developing an uncertainty budget will also be discussed.