Releasing sediments while reconnecting rivers: how do channels respond and how long does it take?

dc.contributor.authorCollins, Mathias
dc.contributor.authorBaker, Matthew
dc.contributor.authorCashman, Matthew
dc.contributor.authorMiller, Andrew
dc.contributor.authorRyswick, Stephen Van
dc.date.accessioned2023-04-03T18:35:25Z
dc.date.available2023-04-03T18:35:25Z
dc.date.issued2023-04-03
dc.descriptionEGU General Assembly 2023, Vienna, Austria & Online, 23-28 April 2023en_US
dc.description.abstractSediment management is an important aspect of river reconnection projects, often driving costs and influencing community acceptance. At sites with uncontaminated sediments, downstream release is an attractive option because it is often the cheapest and most practical approach and the sediment can be ecologically beneficial to downstream areas deprived of it for years by the dam. To employ this option, project proponents must estimate the sediment quantity to be released and, if substantial, estimate how long it will take to erode, where it will go, and how long it will stay there. We investigated these issues for sediments released by the 2018 removal of Bloede Dam on the Patapsco River in Maryland, USA. The dam was about 10 m high and its impoundment filled with sand and mud. Taking the surface elevations of these sediments surveyed immediately before removal and subtracting estimates of the pre-dam valley elevations derived from 21 cores and post-removal surveys of exhumed pre-dam surfaces, we estimate there was approximately 186,600 m3 of stored sediment composed of 70% sand and 30% mud. These proportions match estimates made during pre-removal engineering studies, but our total stored sediment estimate is about 20% less. The difference between estimates reflects a real change in stored sediment quantity between 2018 and 2012 when the engineering studies were completed, additional data available to us after removal, and different estimation methods. After removal, using elevation surveys generated by traditional methods as well as UAS-based aerial imagery and structure-from-motion (SfM) at high temporal resolution, we documented rapid erosion of the stored sediments in the first six months (~60%) followed by greatly reduced erosion rates for the next couple of years. A stable channel was developed in the impoundment during the rapid erosion phase. These results are similar to a two-phased erosion response reported for sediment releases at dam removals around the world across a range of dam and watershed scales, indicating what practitioners and communities should expect when reconnecting rivers in similar settings. Downstream, repeat surveys combined with discharge and sediment gaging show rapid transport of eroded sediments through a 5 km reach, especially during the first year when discharges were above normal, and little overbank storage.en_US
dc.description.urihttps://meetingorganizer.copernicus.org/EGU23/EGU23-7225.htmlen_US
dc.format.extent2 pagesen_US
dc.genreconference papers and proceedingsen_US
dc.identifierdoi:10.13016/m2wdwm-ivwo
dc.identifier.citationCollins, Mathias, et al. "Releasing sediments while reconnecting rivers: how do channels respond and how long does it take?" EGU General Assembly 2023, EGU23-7225 (Vienna, Austria & Online, 23–28 April 2023). https://doi.org/10.5194/egusphere-egu23-7225.en_US
dc.identifier.urihttps://doi.org/10.5194/egusphere-egu23-7225
dc.identifier.urihttp://hdl.handle.net/11603/27232
dc.language.isoen_USen_US
dc.publisherEGUen_US
dc.relation.isAvailableAtThe University of Maryland, Baltimore County (UMBC)
dc.relation.ispartofUMBC Geography and Environmental Systems Department Collection
dc.relation.ispartofUMBC Faculty Collection
dc.rightsThis work was written as part of one of the author's official duties as an Employee of the United States Government and is therefore a work of the United States Government. In accordance with 17 U.S.C. 105, no copyright protection is available for such works under U.S. Law.en_US
dc.rightsPublic Domain Mark 1.0*
dc.rights.urihttp://creativecommons.org/publicdomain/mark/1.0/*
dc.titleReleasing sediments while reconnecting rivers: how do channels respond and how long does it take?en_US
dc.typeTexten_US
dcterms.creatorhttps://orcid.org/0000-0001-5069-0204en_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
EGU23-7225-print.pdf
Size:
356.66 KB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
2.56 KB
Format:
Item-specific license agreed upon to submission
Description: